20201019_141153

The beginning
This detached garage site is directly across the driveway from the main garage.

Screenshot_20210208-210215_Maps

Well, this isn’t the end
but it is the finished project.

20201028_090720

Excavating for the foundation/slab

20201103_110057

Bagging, vapor barrier and steel rebar

Concrete day is always a good day 🙂

20201104_125332

It’s always good to get the slab down and start framing

20201112_115148

On a small outbuilding like this the framing happens pretty fast!

20210105_100919

With a vaulted clear span structure, structural beams called an LVL (laminated veneer lumber) is always a must; not only to support the roof ridge but to provide a center bridge between the outside walls.

20210208_123615

Painting the LVL, now that was a good move.

20210208_210328

The final completed project really turned out nice.